Product Description
The vertical platform is extremely versatile. It is available in three different versions according to the travel height and its design, meeting all customer requirements with its variety of platform dimensions.
Ideal Accessibility Solutions
- Private premises: Banks, restaurants, shops, offices...
- Public buildings: Schools, institutes...
- Residential: Homes and residential buildings.
Easy, Safe & Versatile
Easy installation and safety in operation make this system ideal for freedom of access to buildings of all types, assuring wheelchair users independent personal mobility. The vertical platform can be installed either in pre-existing openings or in its own shafts. It is also suitable for outdoor use as all components are waterproof.
Safety Guaranteed
User safety is guaranteed by the latest active and passive safety systems, including: safety gear, self-levelling systems, emergency descent mechanism, and anti-blackout device. The platform floor is made of non-slip embossed natural aluminium.
Frequently Asked Questions
Where can this vertical platform lift be installed?
It is ideal for private premises (banks, restaurants, offices), public buildings (schools, institutes), and residential homes.
Is the platform suitable for outdoor installation?
Yes, the platform is designed for both indoor and outdoor use. All components are waterproof to ensure durability in exterior environments.
What safety features are included as standard?
Standard safety features include safety gear, an automatic overspeed valve, emergency stop on board, manual descent for blackouts, and a non-slip aluminium floor.
Can the platform size be customized?
Yes, we offer special size platforms and customized door/shaft colors as optional features to meet specific project requirements.
What is the power requirement for the BLP20 series?
The system operates on a standard 230V 1P voltage, making it compatible with most residential and commercial power supplies.
What is the typical lead time for an order?
The standard lead time for the production and delivery of these vertical platforms is approximately 50 days.